Here are other options that meet your search criteria.
Here are other options that meet your search criteria
2002 Pierce Dash 105' Aerial

2002 Pierce Dash 85' Platform
2002 Ferrara HME 75' Quint

2002 Smeal HME 100' Platform

Bronto 100’ RLP Platform
Class 1 Enfo-III system
Class 1 Pressure governor
Warning light system – Federal upper/lower
Lighting / receptacles placed per drawings
Electronic siren – Federal PA-4000 200-W
Rear Directional Arrow – Federal Signal-Master
Niehoff 290-Amp alternator
Four (4) group 31 950CCA batteries
Roll up doors – satin finish select locations
Stainless pan doors – painted finish select locations
Slide-out platform below pump panel
SCBA storage – seven (7) bottles
Wheel chock storage – no chocks included
Two (2) way intercom – pump panel / basket
Ladder compliment (stored):
• Alcolite PEL 35
• Alcolite PRL 18
• Alcolite PRL 16
• Alcolite AEL 12
• Alcolite FL 10
• Alcolite PEL 24
Pike Poles (stored):
• 6’
• 8’
• 10’
• 12’
Additional:
• Skylift operator’s manual included
• Cyclone chassis service manual included
• Cyclone operator’s manual included
• DOT performed – January, 2024
• *Aerial inspection performed – May, 2024
• **Pump test performed – June 2024
Recent Repairs:
• Pump:
Rebuilt main pump drain
Rebuilt all suction and discharge valves:
Removed, torn down, housings sandblasted, new stainless balls, seals
Replaced both 6” butterfly intake valves
Replaced both primers
Replaced both waterway flex hoses
Resealed waterway
**Complete pump service test
• Chassis
Replaced rear frame crossmembers
Replaced all batteries
Rewired 110-V electrical system
Replaced 120-V generator
Tested electrical and replaced all inoperable lights/lens
Replaced Kussmaul battery conditioner
Muffler / clamps
• Ladder / accessories
*Third party ladder inspection and test
Breathing air cylinders painted and Hydro-tested